Now showing items 1-20 of 33

    • Wei, G.; Verdict, M.; Martinez, J. T. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2005)
    • Zhou, J.; Wei, G.; Turner, W. D.; Claridge, D. E. (Energy Systems Laboratory, 2008-12)
      Air-side economizer is broadly adopted in building HVAC design and operations. When the system is properly designed and the control sequence is properly implemented, air-side economizer provides significant energy savings. ...
    • Zhou, J.; Wei, G.; Turner, W. D.; Claridge, D. E. (Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)
      Air-side economizer is broadly adopted in building HVAC design and operations. When the system is properly designed and the control sequence is properly implemented, air-side economizer provides significant energy savings. ...
    • Wei, G. (Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University; Department of Mechanical Engineering, Texas A&M University, 1997)
      This report presents an analysis of the HVAC system at the Willow Branch Intermediate School for the MEEN 685 class project. The school is located at College Station, Texas. A portion of the school belonged to Oakwood ...
    • Verdict, M.; Wei, G.; Martinez, J.; Claridge, D.; Baltazar-Cervantes, J. C.; Turner, W. D. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2004)
      This paper provides a business and technical case study for the Continuous Commissioning®(CC®) 1 process developed by the Energy Systems Laboratory (ESL) at Texas A&M University System for building optimization. The business ...
    • Zhou, J.; Wei, G.; Turner, W. D.; Deng, S.; Claridge, D.; Contreras, O. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2002)
      The existence of a 1.4-million-gallon chilled water thermal storage tank greatly increases the operational flexibility of a campuswide chilled water system under a four-part electricity rate structure. While significant ...
    • Turner, W. D.; Baltazar-Cervantes, J. C.; Zeig, G.; Wei, G. (Texas A&M University (http://www.tamu.edu); Energy Systems Laboratory (http://esl.tamu.edu), 2007)
      This paper presents a case study for Continuous Commissioning® (CC®)of a 520,000 square foot medical research facility. All of the primary energy using systems in the building were investigated to determine their existing ...
    • Joo, I. S.; Turner, W. D.; Song, L.; Dong, D.; Baltazar-Cervantes, J. C.; Napper, G.; Wei, G. (Texas A&M University (http://www.tamu.edu); Energy Systems Laboratory (http://esl.tamu.edu), 2007)
      Continuous Commissioning (CC) is a proven, highly cost-effective process that can improve building comfort and reduce energy consumption. This paper discusses the CC of three public schools in Austin, Texas. These schools ...
    • Yagua, C.; Zhou, J.; Wei, G.; Deng, S.; Turner, D.; Parker, J. (Energy Systems Laboratory (http://esl.tamu.edu), 2009-11)
      This paper presents a case study of a Continuous Commissioning (CC) project performed at the Austin City Hall. Various CC measures were implemented and significant energy savings were achieved. The paper illustrates a ...
    • Yazdani, B.; Schroeder, F.; Kramer, L.; Baltazar, J. C.; Turner, W. D.; Wei, G.; Deng, S.; Henson, R.; Dennis, J. R.; T., R. (Energy System Laboratory (http://esl.tamu.edu), 2008-10)
      The DFW International Airport is one of the largest and busiest airports in the world. Located in North Texas, squarely between the cities of Dallas and Fort Worth, the DFW Airport not only serves a huge population in ...
    • Jones, A.; Claridge, D. E.; Turner, W. D.; Deng, S.; Wei, G.; Zeig, G. (Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)
      This paper compiles the Continuous Commissioning® (CC®) costs, savings, and opportunities implemented in 20 hospital and laboratory commissioning projects involving 48 buildings. The potential savings and costs from 25 CC ...
    • Yagua, C.; Wei, G.; Napper, G.; Turner, D.; Effinger, M.; Shahsavary, F. (Energy Systems Laboratory (http://esl.tamu.edu), 2009-11)
      This paper presents a case study for the optimization of a multipurpose facility in a school district. The facility is a single-story building with a total conditioned area of 35,571 ft2. It contains a full size basketball ...
    • Bynum, J.; Claridge, D. E.; Turner, W. D.; Deng, S.; Wei, G. (Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)
      Continuous Commissioning® data including savings, costs, and implemented measures from over 60 buildings and sites commissioned by staff from the Energy Systems Laboratory at Texas A&M University are presented. Measured ...
    • Wei, G.; Sakuri, Y.; Claridge, D. E.; Turner, W. D.; Liu, M. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2000)
      Thermal energy storage systems store the thermal energy produced by the chiller plant in periods of off-peak electrical demand or when cheaper electricity is available. The stored thermal energy is then withdrawn from the ...
    • Martinez, J. T.; Claridge, D.; Baltazar-Cervantes, J. C.; Turner, W. D.; Wei, G.; Verdict, M. (Texas A&M University (http://www.tamu.edu); Energy Systems Laboratory (http://esl.tamu.edu), 2006)
      his paper presents a case study where Continuous Commissioning (CC), a process that optimizes the HVAC system operation and controls to reduce the building energy consumption and improve comfort, was embedded as one Energy ...
    • Zhou, J.; Wei, G.; Turner, W. D.; Deng, S.; Claridge, D. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2006)
      Humidity control for single-duct single-zone (SDSZ) constant volume air handling units is known to be a challenge. The operation of these systems is governed by space temperature only. Under mild weather conditions, discharge ...
    • Zhou, J.; Giebler, T.; Wei, G.; Turner, W. D. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2003)
      The recent budget cuts campaign mandated by the governor's office had all state agencies in Texas looking for ways to reduce revenue spending. One of the cost savings opportunities perceived by many university officials ...
    • Wei, G.; Claridge, D. E.; Sakuri, Y.; M. Liu (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2000)
      In a VAV (variable air volume) system, the set point of the static pressure (usually measured at 213 downstream of the main supply air duct) is maintained by modulating the fan speed or inlet guide vane position. The set ...
    • Wei, G.; Martinez, J.; Minihan, T.; Brundidge, T.; Claridge, D. E.; Turner, W. D. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2003)
      This paper discusses improved control strategies for dual-duct single-fan variable air volume (VAV) systems. Common control strategy for supply air volume modulation is evaluated, and an improved air volume control strategy ...
    • Wei, G.; Zhou, J.; Turner, D. (Energy Systems Laboratory, 2009-11)
      Continuous Commissioning (CC) is a process that resolves operating problems, optimizes the HVAC system operation and controls to reduce building energy consumption and improve comfort based on current building conditions ...